The old Terracotta damaged sewer shaft.
We had to excavate approx 1.m deep by hand.
We installed a new 150mm PVC boundary trap, inspection openings and low level vent.
We concreted around the base of the boundary trap for support
Back filled and removed all rubbish to the tip.