Sewer diversion at Hunters Hill

Posted by on Aug 20, 2018 in Recent Jobs | Comments Off on Sewer diversion at Hunters Hill

Sewer diversion at Hunters Hill

kitchen drainage under the house. CMF sparged all drainage with sand and cement for support.

CMF connected to the existing downstairs bathroom drainage.

CMF ran a new high level line to a new washing machine.

CMF installed a new branch line to run under the house and a new overflow gully. The existing terra-cotta sewer drainage which ran around the front and side of the house was severely damaged.