kitchen drainage under the house. CMF sparged all drainage with sand and cement for support.
CMF connected to the existing downstairs bathroom drainage.
CMF ran a new high level line to a new washing machine.
CMF installed a new branch line to run under the house and a new overflow gully. The existing terra-cotta sewer drainage which ran around the front and side of the house was severely damaged.