Hot water unit at Russell Lea

Posted by on Nov 26, 2014 in Recent Jobs | Comments Off on Hot water unit at Russell Lea

Hot water unit at Russell Lea

hws1
This leaking 50ltr HWU was installed illegally using flexible hoses.
hws2
CMF supplied and installed a new 50ltr Rheem HWU. CMF also installed a tempering valve as required by law, a new isolation valve and connected the water using hard drawn copper tube.