CMF drained, disconnected and capped off the existing burst hot water unit in the roof.
CMF supplied and installed a new Rheem 400 liter electric storage hot water unit outside.
Stipo Electrical ran a new power supply to the new hot water unit and disconnected the old hot water unit in the roof.