CMF storm water at East Ryde

Posted by on May 24, 2015 in Recent Jobs | Comments Off on CMF storm water at East Ryde

CMF storm water at East Ryde

CMF Plumbing storm water repair at East Ryde

 

CMF re-diverted a new 90mm stormwater drainage line to replace the damaged and tree root infested terra cotta line

CMF re-diverted a new 90mm stormwater drainage line to replace the damaged and tree root infested terra cotta line

IMG_2636

CMF connected into the existing line just past the back of the house. Another plumber had replaced all the back drainage with 90mm PVC  and had pushed the 90mm into the old terra cotta, which we connected to.

CMF connected into the existing line just past the back of the house. Another plumber had replaced all the back drainage with 90mm PVC and had pushed the 90mm into the old terra cotta, which we connected to.

CMF also replaced a damaged terra cotta sewer junction outside the toilet, which had tree roots growing into.

CMF also replaced a damaged terra cotta sewer junction outside the toilet, which had tree roots growing into.