CMF Plumbing replaced sewer drainage at Epping
We replaced the old root infested terra-cotta sewer drainage with PVC.
We changed the direction of the new PVC drainage, running it closer to the boundary in case of future building on the property.
We installed new 100mm PVC sewer drainage and a damaged section of the storm water drainage that was also exposed.
We replaced the sewer shaft, connecting to the existing terra cotta house service line which we CCTV inspected 15m into the neighbour’s property. We found the existing line had been re-lined by Sydney Water.