CMF Plumbing altered the existing copper pipe work and installed a new shower breaching piece, moved existing tub points for new hand basin, capped off existing washing machine taps on the adjacent wall and installed new washing machine water points next to the new hand basin points.
CMF Plumbing capped off existing washing machine points above the toilet and installed a new hose tap next to the toilet.
CMF Plumbing saw cut and excavated the concrete floor. We installed new PVC drainage for the shower, basin, floor waste and washing machine.
Different angle of new PVC drainage.
CMF Plumbing back filled and concreted.
We installed the shower tap ware, new vanity hand basin, washing machine taps and drainage.
Different angle of shower and Vanity.