We installed a new shower breaching piece and moved the toilet water point.
We installed new laundry tub points on the adjacent wall to make more room for accessing the shower with a walking frame. We core drilled through the brick wall for the new tub drainage.
We excavated and moved the existing toilet drainage to move the toilet closer to the corner to again make more room for the walker access to the shower. We raised a clear out point for future access to the sewer drainage.