We installed this new ZIP Hydro tap which supplies boiling and chilled water. This is a replacement unit as the original burst and flooded the office. We have installed in a new safe waste tray and installed a new 40mm PVC drain to outside.
This is the new Hydro tap which supplies instant boiling water at 95degrees and chilled water at 5degrees.
We core drilled a hole through the outside concrete wall. This is the vermin flap on the outside end of the drain to prevent creepy crawly’s getting inside.
The new safe waste tray and 40mm PVC drain.