New P c drainage for a shower, floor waste drain, hand basin and toilet.
We altered the copper water pipes and changed the positions of the drainage points for the shower, basin and floor waste drain.
We raised the shower taps and rose by installing a new shower breaching piece. We also moved the shower drain to the centre of shower.
We also moved toilet drainage back to the wall and raised the water point to the back of the cistern to suit the new toilet suite.
The new close couple toilet suite and wall hung hand basin.