CMF Bathroom renovation at George’s Hall

Posted by on Nov 8, 2017 in Recent Jobs | Comments Off on CMF Bathroom renovation at George’s Hall

CMF Bathroom renovation at George’s Hall

CMF roughed in new copper hot and cold water pipes for a shower basin and toilet.

CMF Plumbing installed new PVC drainage for the shower, basin and a new floor waste drain.