Posted by admin on Nov 8, 2017 in Recent Jobs | Comments Off on CMF Bathroom renovation at George’s Hall
CMF roughed in new copper hot and cold water pipes for a shower basin and toilet.
CMF Plumbing installed new PVC drainage for the shower, basin and a new floor waste drain.