We roughed in a new water point for the toilet prior to tiling and installed new suite after tiling.
We roughed in new copper water pipes for the new toilet, basin and shower prior to tiling. We return once tiled to install the toilet suite, wall hung basin, shower head and wall mixer.
converted the old shower to washing machine taps and drainage. The builder built a raised platform to sit the washing machine on and the drier was mounted on the wall above the washing machine.