
CMF replaced the damaged ceiling tiles.


The 40mm copper hot water flow pipe from the hot water units to the North Tower was slightly leaking in 3 spots.

shut the hot water system down to the building and installed a new 40mm copper section of hot water flow pipe below the existing.
=
