We roughed in new copper hot and cold water pipes.


We installed new PVC drainage for a toilet, basin, floor waste and tub.


We installed a new toilet and hand basin.

New shower taps and hand held shower rail.

Posted by admin on Dec 1, 2014 in Recent Jobs | Comments Off on Bathroom renovation at Warriewood NSW
We roughed in new copper hot and cold water pipes.


We installed new PVC drainage for a toilet, basin, floor waste and tub.


We installed a new toilet and hand basin.

New shower taps and hand held shower rail.
