CMF Plumbing re-positioned the water and drainage to suit a new pedestal basin at this Concord property
The old basin hot and cold water pipes and drainage.

We installed a new surface mounted shower wall mixer.

The original shower pipe work

Posted by admin on Dec 3, 2014 in Recent Jobs | Comments Off on Bathroom renovation at Concord
CMF Plumbing re-positioned the water and drainage to suit a new pedestal basin at this Concord property
The old basin hot and cold water pipes and drainage.

We installed a new surface mounted shower wall mixer.

The original shower pipe work
